Difference between revisions of "Building Committee 2017"

From Bloominglabs
Jump to: navigation, search
(Materials from current building which belong to Bloominglabs)
Line 57: Line 57:
 
* water heater - belongs to Dale Myers, he may want it back
 
* water heater - belongs to Dale Myers, he may want it back
 
* window AC unit
 
* window AC unit
 +
* emergency exit lights over front and rear doors
 
* paper towel dispensers
 
* paper towel dispensers
 
* exterior exhaust vent louvres
 
* exterior exhaust vent louvres

Revision as of 13:48, 19 July 2017

This is a page to organize our relocation in 2017.


Contents

Things we have currently

  • $4 per square foot
  • 3200 square feet
  • Excess parking
  • Easy access to B-line trail
  • Clean room area / hangout area
  • Workshop area
  • Garage door
  • RFID access


Potential Space Candidates

  • South Walnut location
  • South Rogers location
  • Downtown location/Kiln building


Things we Need

This assumes basic minimums of a usable property are met such as non-leaky roof, working HVAC, cold+hot water, etc.

  • ~$4 per square foot
  • 3000 square feet minimum
  • Enough parking
  • High-speed internet access
  • Clean area
  • Workshop area
  • Ability to support RFID door access system
  • 200A service minimum for our area, more is better though
  • Ability to install through-exterior-wall vents for laser (minimum), also for welding and laboratory areas if possible


Things we Want

  • Access to B-line trail
  • More space
  • Garage door
  • Area for car lift
  • Isolated wood shop and metal shop areas
  • The ability to get more space as we grow
  • Ability to mount antennas, weather station, etc. on the building or on the property
  • Access to our own breaker panel
  • Ability to run cables through walls (RFID, ethernet, CCTV (coax), etc.
  • Sound insulated area for air compressor and dust collection system
  • Pneumatic lines ran from compressor to useful areas in wood shop, metal shop, labratory, etc
  • Ceiling hung retractable extension cords in workshop('s) - we have a number of these ready to be installed


Materials from current building which belong to Bloominglabs

Mid-wall refers to the long wall that divides the office from the workshop.

  • water heater - belongs to Dale Myers, he may want it back
  • window AC unit
  • emergency exit lights over front and rear doors
  • paper towel dispensers
  • exterior exhaust vent louvres
  • all door knobs installed in building, originals should be in a safe place
  • RFID system, including electric strikes installed in both door frames
    • Might be worth replacing these, ours are cheap and known for wearing out
  • server room framed door, mid-wall framed door
  • all cat5 in building
  • AC wiring (romex) in mid-wall, oulets, boxes, etc.
  • AC wiring around exterior walls of the workshop, stopping at the rear door
  • AC sub-panel and all wiring, conduit, outlet, etc. feeding the air compressor
  • all 220v outlets in workshop
  • all lights on ceiling minus four of the 8' fixtures in cluding wiring
  • motion light outside garage door
  • light sensor for front door light
  • Bloominglabs sign above our front door
  • all exterior antennas and related grounding wires
  • interior signs hung from ceiling
  • all shelves attached to walls
Personal tools