Difference between revisions of "Machining workshop prep notes"
From Bloominglabs
Line 8: | Line 8: | ||
* Verify dial-indicators are all located and working | * Verify dial-indicators are all located and working | ||
* Check that oiling charts, cutting tool grinding charts, and decimal-to-fraction posters are still in place | * Check that oiling charts, cutting tool grinding charts, and decimal-to-fraction posters are still in place | ||
+ | ** The [[Signage]] page has copies of all shop posters for reprinting if neccessary | ||
* Send reminder email out for homework | * Send reminder email out for homework | ||
Line 19: | Line 20: | ||
− | [[Category:Workshops]] [[Category:Workshop prep notes]] | + | [[Category:Workshops]] [[Category:Workshop prep notes]] [[Category:Signage]] |
Latest revision as of 15:29, 5 April 2017
Instructor notes for conducting a machining class, a fair number of tools and materials need to be stocked and setup ahead of time in order for the classes to run smoothly.
[edit] At least 2 weeks before class
- Order metal stock if needed
- Verify we have enough spindle & way oil
- Verify we have usable cutting bits and end mills
- Verify calipers all have good batteries (locate all sets of calipers)
- Verify dial-indicators are all located and working
- Check that oiling charts, cutting tool grinding charts, and decimal-to-fraction posters are still in place
- The Signage page has copies of all shop posters for reprinting if neccessary
- Send reminder email out for homework
[edit] Weekend before class
- Clean up workbenches, make sure machines are in working order and are not missing tools and parts
- Verify EPO switches are working correctly
- Locate all oil cans, top them off as needed
- Sharpen lathe cutting tools for first class
- Print drawings for part students will make
- Send reminder email about appropriate attire, workshop fees if not already collected